Project name: Storage hall - bss - phase II
Client: bss BÁŇSKÁ STAVEBNÍ SPOLEČNOST s.r.o.
Price: 32.000.000,-CZK
Completed: 2015
Description:
Storage hall a total area of 5883 m2 - The hall will be based on a system of reinforced concrete footings and foundation base. The hall has a steel structure consisting of thin-walled screwed elements, walls and roof are clad with steel trapezoidal sheet, front hall and half gable walls are made pleated wall sheathing. The hall has a rectangular plan, divided into three storage sections, Hall height is 9.8 m.
Manipulation area - 2850m² of the concrete cover lined by road curbs.
Retention tank - 480m³, sewer connection - 334 m, electric connection - 100 m, water connection - 109 m, and more.